The extension is moving full steam ahead. The french doors went in (these ones actually need to be changed, they are backward, but they do for now.) Originally we had fancy concertina doors, but the budget lead us to UPVC french doors instead. They should do just fine for little kids opening and close many, many times.
The whole external wall (facing our neighbours) is going to be rendered. So breeze block has been used.
The front aspect of the house will be clad in timber, so it isn't being blocked with bricks.
When the brickwork was completed, they decided it was time to knock through into the house. I didn't realise they did external walls in two phases, but our builders said it was the norm. On Thursday, they propped up the house and took off the first skin of bricks. (External) We have caviity wall insulation, which is what all the weird grey stuff is in this photo.
The skin of bricks came down, and the first RSJ (Reinforced Steel Joist) went in.
On Friday, the final layer of bricks came out, the RSJ went in and the extension and house were locked together.
Did I mention we're having a cat door built into the wall? Yup. It's kind of a high entrance on the outside, but works on the inside. We'll perhaps put in a step when things are finished. The cat has managed to use it as is, though.
A few more pictures of the hold in the wall.
The builders have been boxing in the room, with insulation and plasterboard going up at a pace.
The french doors (installed backwards) with the glass. The cat door is currently covered in plasterboard.
And for good measure we duck taped around the boiler closet. The tape will probably take off the paint, but I'd rather repaint than deal with all the dust. I taped the plastic to the floor as well, plus covered the light and the outlets, and it worked pretty well.